In an underload situation, the thread scheduler doesn't delay ready-to-run threads, but the highest-priority thread might not run if the thread scheduler is balancing budgets.
In very unlikely cases, a large window size can cause some scheduler partitions to experience runtime delays, but these delays are always less than what would occur without adaptive partitioning thread scheduling. There are two cases where this can occur.
Case 1
If a scheduler partition's budget is budget milliseconds, then the delay is never longer than:
window_size − smallest_budget + largest_budget
This upper bound is only ever reached when low-budget and low-priority scheduler partitions interact with two other scheduler partitions in a specific way, and then only when all threads in the system are ready to run for very long intervals. This maximum possible delay has an extremely low chance of occurring.
For example, given these scheduler partitions:
This delay happens when the following occurs:
Case 2
Still rare, but more common, is a delay of window_size − budget milliseconds, which may occur to low-budget scheduler partitions with, on average, priorities equal to other partitions.
With a typical mix of thread priorities, when ready to run, each scheduler partition typically experiences a maximum delay of much less than the window_size milliseconds.
For example, let's suppose we have these scheduler partitions:
This delay occurs when the following happens:
However, this pattern occurs only if the 10% application never suspends (which is exceedingly unlikely), and if there are no threads of other priorities (also exceedingly unlikely).
Approximating the delays
Because these scenarios are complicated, and the maximum delay time is a function of the partition shares, we approximate this rule by saying that the maximum ready-queue delay time is twice the window size.
The practical way to verify that your scheduling delays are correct is to load your system with stress loads, and use the System Profiler tool from the IDE to monitor the delays. The aps command lets you change budgets dynamically, so you can quickly confirm that you have the correct configuration of budgets.